1. OVERVIEW
1.1 Features
1 - 3
1
OVERVIEW
2
SYSTEM
CONFIGURATION
3
SPECIFICATIONS
4
PARTS NAME
5
UL, cUL
STANDARDS AND
EMC DIRECTIVE
6
INSTALLATION
7
WIRING
8
OPTION
1.1.1 Rough procedure
The outline procedures before operating GOT and the descriptions of each item are shown below.
Install GT Designer3 in the PC.
Refer to GT Designer3 Version1 Screen Design Manual
(Fundamentals).
Create project data.
Refer to GT Designer3 Version1 Screen Design Manual
(Functions).
Wire for the GOT power supply and the controller.
7. WIRING
Refer to GOT1000 Series Connection Manual for GT Works3.
Wire for the controller power supply and I/O.
Controller manuals
Turn on the power of GOT and controller.
Install the OS to GOT.
16. INSTALLATION OF COREOS, BOOTOS AND
STANDARD MONITOR OS
Refer to GT Designer3 Version1 Screen Design Manual
(Fundamentals).
Check that the OS is installed to GOT.
Download project data.
Refer to GT Designer3 Version1 Screen Design Manual
(Fundamentals).
Turn on the controller power and check that the GOT
recognizes the controller.
Check that the monitoring is normal.