194 Micro Motion
®
Series 3000 MVD Transmitters and Controllers
Measurement Performance
Detailed test data with the Communicator
Note: Requires Smart Meter Verification. No detailed test data is available with the original version
of the meter verification application.
For each Smart Meter Verification test, the following data is stored on the transmitter:
• Powered-on hours at the time of the test
• Test result
• Stiffness of the left and right pickoffs, shown as percentage variation from the factory value. If
the test aborted, 0 is stored for these values.
• Abort code, if applicable
The Communicator also provides a trend function that allows you to compare the results of the 20
tests, viewed as either a table or a graph.
To view this data, see Figure 21-8.
Figure 21-8 Meter verification test data – Communicator
2
1 Run Counter
2 Running Hours
3 Test Result
4 Abort Code
5 LPO Stiffness
5 RPO Stiffness
7 Show Results Table
8 Show Results Plot
1 Run Meter Verification
2 View Test Results
3 Schedule Meter Verification
6 3
Online >
1 Overview >
3 Shortcuts >
6 Meter Verification
Online >
3 Service Tools >
4 Maintenance >
1 Routine Maintenance >
3 Meter Verification
Test Result #x
Run Counter
Running Hours
Test Result
Abort Code
LPO Stiffness
RPO Stiffness
Abort OK
To previous test