Emerson Series 3000 MVD Satellite Radio User Manual


 
186 Micro Motion
®
Series 3000 MVD Transmitters and Controllers
Measurement Performance
Figure 21-2 Meter verification test, original version – Display
21.3.3 Running Smart Meter Verification
To run a Smart Meter Verification test:
With ProLink II, see Figure 21-3.
With the display, see Figure 21-4.
With the Communicator, see Figure 21-5.
Note: If the custody transfer application is installed and the transmitter is secured, you can run a
Smart Meter Verification test with outputs set to Continue Measuring or Fault. Last Measured Value
is not available. See Section 19.3 for detailed information.
Note: If you start a Smart Meter Verification test from ProLink II or the Communicator, and the
outputs are set to Last Measured Value or Fault, the transmitter display shows the following message:
SENSOR
VERFY/x%
Start Meter Verify
Progress . . . . . . . . . x%
PASS ABORTFAIL
Select
Set Uncertainty Limit
(1)
Maintenance Menu >
Meter Verification >
Set output behavior
Proceed?
Yes
(1) Enter the uncertainty limit as a decimal value,
e.g., 0.0400 (4%).