A SERVICE OF

logo

DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Commands
8-224status bri-port
8
BRI 0-126 L3-Assigned ext# blank This is a transitory state for BRI
endpoints that support MIM initialization.
1. Wait 5 seconds and repeat the
command. If the state has not
changed, continue with Step 2.
2. Make sure SPID administration on
the switch and endpoint are
consistent. Repeat status bri-port
to determine whether the Layer 2
state of the signaling link is
L3-Established. If it is not, go to
Step 3.
3. Try replacing the endpoint. Repeat
status bri-port to determine
whether the Layer 2 state of the
signaling link is L3-Established.
If it is not, follow normal escalation
procedures.
BRI 0-126 L3-Assigned ext# yes This is a transitory state for BRI
endpoints that support MIM initialization
when a SPID Facility Test has been
used to initialize the station.
1. Wait 5 seconds and repeat the
command. If the state has not
changed continue with Step 2.
2. Make sure SPID administration on
the switch and endpoints are
consistent. Repeat status bri-port
to determine whether the Layer 2
state of the signaling link is
L3-Established. If it is not, go to
Step 3.
3. Try replacing the endpoint. Repeat
status bri-port to determine
whether the Layer 2 state of the
signaling link is L3-Established.
If it is not, follow normal escalation
procedures.
Table 8-10. Interpreting BRI-Port Status Reports — Continued
Error
Type
Aux
Data Associated Test
Alarm
Level
On/Off
Board Test to Clear Value
Continued on next page