![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/2/07/207ea955-b0a5-4690-afdf-8b9461a5122e/207ea955-b0a5-4690-afdf-8b9461a5122e-bg75e.png)
DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-1202PGATE-BD (Packet Gateway Circuit Pack)
9
Circuit Pack Restart Test (#252)
This test is destructive
.
This test is used to reset the circuit pack. This test is not part of either short or
long demand test sequence and is executed only on detection of PPCPU errors.
The circuit pack is reset via the SAKI Sanity Test (#53).
The SAKI Sanity Test resets the circuit pack. This test fails if the circuit pack does
not return to a sane state after being reset.
LANBIC Receive Parity Error Counter Test (#595)
The test reads and clears the LANBIC Receive Parity Error Counter on the Packet
Gateway circuit pack. This counter is incremented by the circuit pack when it
detects a parity error with a received frame from the packet bus.
Table 9-478. Test #252 Circuit Pack Restart Test
Error
Code
Tes t
Result Description/ Recommendation
None ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
1015 ABORT Port is not out-of-service.
1. Busyout the circuit pack.
2. Execute command again.
2100 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
1 FAIL The circuit pack failed to reset.
1. Execute command again.
2. If the problem persists, then pull out and reinsert the circuit pack.
3. If the problem persists, replace the circuit pack.
2 FAIL The circuit pack failed to restart.
1. Execute command again.
2. If the problem persists, then pull out and reinsert the circuit pack.
3. If the problem persists, replace the circuit pack.
PASS The circuit pack initializes correctly.
1. Run the short test sequence.
Continued on next page