Tektronix AWG2005 Stereo System User Manual


 
Performance Tests
Performance Verification
4Ć22
These procedures check operation of external AM, external ADD, internal
AM and internal Add arithmetic functions.
NOTE
The arithmetic operation checks are structured as a continuous
series of tests. After Check External AM Operation, each test uses
the control settings from the last test and uses the next step in the
autostep file.
Check External AM Operation
Electrical Characteristic Checked: External amplitude modulation,
pageĂ1Ć13.
Equipment Required: Two 50Ăcoaxial cables, a 50 terminator, a
function generator, and a digital multimeter (DMM).
Prerequisites: The AWG2005 meets the prerequisites listed on page 4Ć7.
Procedure:
1. Install test hookup and set test equipment controls:
a. Hook up DMM: Connect the AWG2005 CH1 output through a coaxial
cable, the 50 terminator, and BNCĆtoĆdual banana connector to
the DMM INPUT connector.
b. Hook up function generator: Connect the AWG2005 rearĆpanel CH1
AM IN input through a coaxial cable to the function generator output
(see Figure 4Ć9).
Arithmetic Operation
Checks