Option Description
Outputs Continue
Measuring
During the test, all outputs will continue to report their assigned proc-
ess variable. The test will run for approximately 90 seconds.
Outputs Held at Last
Value
During the test, all outputs will report the last measured value of their
assigned process variable. The test will run for approximately
140 seconds.
Outputs Held at Fault During the test, all outputs will go to their configured fault action. The
test will run for approximately 140 seconds.
5. Press Start Meter Verification.
Test progress is displayed on the screen.
Postrequisites
View the test results and take any appropriate actions.
Run a Smart Meter Verification test using ProLink III
1. Choose Device Tools > Diagnostics > Meter Verification > Run Test.
You may need to wait a few seconds while ProLink II synchronizes its database with
the transmitter data.
2. Enter any desired information on the Test Definition screen, and click Next.
All information on this screen is optional.
3. Choose the desired output behavior.
Option Description
Continue Measur-
ing
During the test, all outputs will continue to report their assigned process
variable. The test will run for approximately 90 seconds.
Held at Last Value During the test, all outputs will report the last measured value of their as-
signed process variable. The test will run for approximately 140 seconds.
Held at Fault During the test, all outputs will go to their configured fault action. The
test will run for approximately 140 seconds.
4. Press Start.
Test progress is displayed on the screen.
Postrequisites
View the test results and take any appropriate actions.
Run a Smart Meter Verification test using the
Field Communicator
1. Navigate to the Smart Meter Verification menu:
Measurement support
140 Micro Motion
®
Model 1700 Transmitters with Analog Outputs