Emerson Model 1700 Satellite Radio User Manual


 
Smart Meter Verification flowchart: Running a test using the Chinese-language
display
Running a Smart Meter Verification test using the Chinese-language displayFigure 9-4:
Stop?/Yes
. . . . . . . . . . . . . . . x%
Pass Verify Abort VerifyCaution Verify
Fail
Abort
Sensor Rerun?
Yes No
Correct condition
Run Verify
Continue Measure Last Value
Select
Down Down
Up
Select
Down
Results View/Yes?
Down Down
Select Select
Select
Select
Select
Sensor Abort?/Yes
SelectUp
Abort Type
Down
Down Select
To Runcount
(see Results Read)
Test result
Pass
Exit
Down
Exit
Down
To Enter Meter Verify
Fault Value
Run a Smart Meter Verification test using ProLink II
1. Choose Tools > Meter Verification > Run Meter Verification.
You may need to wait a few seconds while ProLink II synchronizes its database with
the transmitter data.
2. Review the information presented on the screen, and click Next.
3. Enter any desired information on the Test Definition screen, and click Next.
All information on this screen is optional.
4. Choose the desired output behavior.
Measurement support
Configuration and Use Manual 139