CSA8000B & TDS8000B User Manual
1-17
Incoming Inspection
This section contains instructions for performing an incoming inspection of this
instrument. Performance of an incoming inspection is not required to put the
instrument in service.
These instructions verify that the instrument is operating correctly after
shipment, but do not check product specifications. An incoming inspection
includes the following parts:
H Perform the Diagnostics on page 1--18 runs the internal diagnostics.
H Perform a Compensation on page 1--20 runs the self compensation routine.
H Perform the Functional Tests on page 1--21 uses the DC CALIBRATION
OUTPUT and the INTERNAL CLOCK OUTPUT connectors to verify that
the instrument is functioning.
H Perform the Hardware and Operating System Tests (Windows 98 only) on
page 1--38 uses a software program called QAPlus/Win to verify instrument
hardware and the MS Windows 98 operating system is functioning.
QAPlus/Win is only available on instruments using the MS Windows 98
operating s ystem. Instruments using the MS Windows 2000 operating
system do not include QAPlus/Win software.
NOTE. The procedures that follow contain instructions based on the menus and
controls supported by the version 1.5 release and later of the instrument
firmware. The procedures will work for earlier versions of software, but the
control and menu names may vary slightly.
If the instrument fails any test within this section, it may need service. To contact
Tektronix for service, see Contacting Tektronix on page xiii of Pr eface.
Make sure you have put the instrument into service as detailed in Installation
starting on page 1--9. Then assemble the following test equipment and proceed
with the procedures that follow.
Assemble Equipment
To complete the incoming inspections procedures requires the following test
equipment:
H One SMA cable, such as Tektronix part number 174-1427-00.
H One 50 Ω BNC cable, such as Tektronix part number 174-1341-00.