3. Set Approval to the appropriate regulatory agency for your application.
Option Description
NTEP
Regulatory agency for the U.S.A. and Canada
OIML
Regulatory agency for all other world areas
4. Set Totalizer Reset Options as desired.
Option Description
Not Resettable from Display
and Digital Comm
When the transmitter is secured, totalizers cannot be reset
from either the transmitter display or digital communications.
Resettable from Digital Comm
Only
When the transmitter is secured, you must use digital commu-
nications to reset the totalizers.
Resettable from Display and
Digital Comm
When the transmitter is secured, you can use either the trans-
mitter display or digital communications to reset the totaliz-
ers.
Resettable from Display Only
When the transmitter is secured, you must use the transmitter
display to reset the totalizers.
“Digital communications” refers to any method that uses Modbus or HART
communications to interact with the transmitter. This includes ProLink II, ProLink III,
the Field Communicator, and any host.
5.
If required for your installation, configure your transmitters for two frequency
outputs and set them to operate in Quadrature mode.
a. Choose ProLink > Configuration > Channel.
b. Set Channel B Type Assignment to Frequency Output and click Apply.
c. Set Channel C Type Assignment to Frequency Output and click Apply.
d. Choose ProLink > Configuration > Frequency and set Freq Output Mode to Quadrature.
6. If required for your installation, enable Alarm Menu Password for the display: ProLink >
Configuration > Display.
Alarm Menu Password is required under German law for PTB-type approval for gas
applications, and may be required in other locations or for other application types.
7. If required for your installation, read and record the firmware checksum values for
the transmitter and the core processor: ProLink > Configuration > Device.
The checksum values for the transmitter firmware and the core processor firmware
must be read during meter commissioning to meet Weights & Measures
requirements for gas applications in Germany. They may also be useful for
MID/Welmec 7.2 test reports.
8. If required for your installation, configure Field Verification Zero (FVZ) as a display
variable, then observe and record the current value of FVZ: ProLink > Configuration >
Display.
Set up the Weights & Measures application