A SERVICE OF

logo

PS 300
CM 4000 Installation and Operating ManualQ−2
7. Test power supply by applying power and noting lamp test.
8. Test MPK connections by attaching to Jupiter system controller and verifying operation through each connector.
For more information about the MPK cables, please refer to page 2−63.