Barco 26-0501000-00 Stereo System User Manual


 
18 LED-PRO • User’s Guide
3. Installation
Safety Precautions
p~ÑÉíó=mêÉÅ~ìíáçåë=
For all LED-PRO installation procedures, observe the following important safety and
handling rules to avoid damage to yourself and the equipment:
To protect users from electric shock, ensure that the power supplies for each unit
connect to earth via the ground wire provided in the AC power Cord.
The AC Socket-outlet should be installed near the equipment and be easily
accessible.
råé~ÅâáåÖ=~åÇ=fåëéÉÅíáçå=
Before opening the LED-PRO box, inspect it for damage. If you find any damage, notify the
shipping carrier immediately for all claims adjustments. As you open the box, compare its
contents against the packing slip. If you find any shortages, contact your Barco sales
representative.
Once you have removed all the components from their packaging and checked that all the
listed components are present, visually inspect each unit to ensure there was no damage
during shipping. If there is damage, notify the shipping carrier immediately for all claims
adjustments.
páíÉ=mêÉé~ê~íáçå=
The environment in which you install your LED-PRO(s) should be clean, properly lit, free
from static, and have adequate power, ventilation, and space for all components.
`~ÄäÉ=~åÇ=^Ç~éíÉê=fåÑçêã~íáçå
The table below provides information regarding supplied cables and adapters:
Table 3-1. LED-PRO System Cables and Adapters
Cable / Adapter Description Quantity
VGA to DVI Adapter DVI to HD-15 adapter for analog inputs 1
RS-232 Cable 15 meter, connects customer supplied laptop to LED-PRO 1
DVI to DVI Cable 5 meter, connects LED-PRO output to LED wall (DVI input) 1
DVI to MDR26 Cable 5 meter, standard, connects LED-PRO output to LED wall (MDR input) 1
DVI to MDR26 Cable 5 meter, waterproof, connects LED-PRO output to LED wall (MDR input) 1
AC Power Cord 7 foot, 10A 1