Runco CW-95DHD Headphones User Manual


 
Installation Preparation
16 CineWall™ Installer/Integrator Manual
PRE
L
IMINAR
Y
Power Requirements The CineWall requires clean, noise-free AC power. The power cord provided with the
CineWall is 6 feet (1.83 meters) long. In order to use it, the power outlet must be no more
than 48 inches (1.22 meters) from the cable openings on the right side of the chassis. If
the outlet is farther away, substitute a longer power cord for the one provided with the
CineWall; do not use a power strip or extension cord. If you use a substitute power cord,
ensure that it is a UL- or CSA-approved, three-conductor (18
AWG or heavier), shielded
cord rated at 10 amps minimum.
Site Access The CineWall is shipped in two containers: one for the screen assembly and one for the
chassis and related hardware. The shipping container dimensions are as shown below.
Ensure that the site has a “carry-in” path with sufficient clearances leading to the
installation location. This is particularly important in corners in stairways, landings and
hallways.
101.13 in. (2,568 mm)
7.5 in.
(190 mm)
61.5 in.
(1,562 mm)
Chassis/HardwareScreen
86.25 in. (2,191 mm)
30.0 in.
(762 mm)
58.5 in.
(1,486 mm)
A
A 2,000 mm
B 4,000 mm
C 1,900 mm
D 1,200 mm
E 2,400 mm
F 3,700 mm
B
C
D
E
D
F
A
Minimum Stair/Landing Clearances