5 - 6 5 - 6
MELSEC-GOT
5 PRE-OPERATION SETTINGS AND PROCEDURE
5.4 Mounting Procedures
This section provides the procedures to mount the A8GT-J61BT15 to and from the GOT.
(1) Mounting the A8GT-J61BT15 to the GOT-A900 Series
1) Fit the communication module securing fixtures in
the GOT main unit.
2) Mount the A8GT-J61BT15 on the GOT interface.
3) Tighten and fix the mounting screws (3 pcs.) of the
communication module in the specified torque
range. (39 to 59 N•cm)
4) To remove the unit, reverse the installation
procedure.
(2) Mounting the A8GT-J61BT15 to the GOT800 Series
1) Fit the A8GT-J61BT15 to the mounting section of
the GOT.
2) Tighten the module fixing screws (3 pcs.) to within
the specified torque range (39 to 59N•cm).
3) To remove the unit, reverse the installation
procedure.