(2) Procedure up to CC-Link data link
Install the GOT to the control box.
Check that the Master and Local modules operate independently.
(Hardware test)
Load the Master and Local modules to the base units.
Start
Connect the remote modules and GOT with CC-Link dedicated cable.
Set the station number switches of the A8GT-J61BT15.
Switch on the GOT, remote modules and Master module in this order.
Confirm the connection status of each module. (Line test)
Write a parameter setting program.
Write a communication program for monitoring by Cyclic transmission.
When performing monitoring in the dedicated command monitor method,
create a sequence program that will execute the dedicated commands.
Start data link and monitor data on the GOT.
Complete
⋅⋅⋅⋅⋅
Refer to the Master
⋅⋅⋅⋅⋅
Refer to the user's manual
of the GOT used
module user's manual.
⋅⋅⋅⋅⋅
Refer to the Maste module
user's manual.
⋅⋅⋅⋅⋅
Refer to Section 5.5
⋅⋅⋅⋅⋅
Refer to Section 5.2
Refer to the Maste module
user's manual.