5 - 1 5 - 1
MELSEC-GOT
5 PRE-OPERATION SETTINGS AND PROCEDURE
5. PRE-OPERATION SETTINGS AND PROCEDURE
This chapter provides a pre-operation procedure, the names of the parts and their
settings, and the wiring method for the A8GT-J61BT15.
5.1 Pre-Operation Procedure
The following flowchart indicates a pre-operation procedure.
(1) Procedure up to downloading of monitor screen data to the GOT
Install the OS program installed in the Personal computer into the GOT.
1) Install ROM_BIOS.
ROM_BIOS is factory-installed into the GOT.
It must be installed only when the version of ROM_BIOS installed in the
GOT is older than that of ROM_BIOS currently installed in the personal
computer.
2) When ROM_BIOS installation is complete, reset the GOT power supply.
3) Install the basic OS, communication driver "CC-Link (RD)" and optional
function OS into the GOT.
4) When installation is complete, reset the GOT power supply.
Supply power to the GOT.
Connect the GOT and Personal computer with the RS-232C cable.
Wire the GOT power supply.
Start
Load the A8GT-J61BT15 to the GOT.
Set the switches of the A8GT-J61BT15.
Wire the CC-Link dedicated cable.
Load and wire the optional module.
Switch on the system with which the GOT is connected.
Download the monitor screen data created on the personal computer to the GOT.
When downloading is complete, start monitoring.
Complete
Refer to the user's manual of the GOT used
⋅⋅⋅⋅⋅
Refer to the GT Works Version 5 / GT Designer
Vsersion 5 Referrence Manual or the SW3NIW-
A8GOTP operating manual (Data transmission/
Debugging/Document Creation Manual)
⋅⋅⋅⋅⋅
Refer to Section 5.4
⋅⋅⋅⋅⋅
Refer to Section 5.2
⋅⋅⋅⋅⋅
Refer to Section 5.5
⋅⋅⋅⋅⋅
Refer to the user's manual of the GOT used
⋅⋅⋅⋅⋅
Refer to the GT Works Version 5 / GT Designer
Vsersion 5 Referrence Manual or the SW3NIW-
A8GOTP operating manual (Data transmission/
Debugging/Document Creation Manual)
5