3. Installation Guidelines
How to stack?
Handle as follow:
1. Put the second projector on the first one so that base plate of the second projector matches with the rigging socket of the first
projector. (image 3-12)
2. Turn the rigging sockets of the second projector counter clockwise until they are free to move up and down. (image 3-13)
3. Secure the projectors on each other by bringing the free part of the second projector into the socket of the first projector and turn
a quarter clockwise while pushing downwards until it clicks in.
4. For ceiling mounted configurations, pull on the hook (A) with the cable of the lowest projector. (image 3-14)
5. Guide hook and cable around the carry handle and guide it around the carry handle of the upper projector. (image 3-15)
6. Hook it in the foreseen hole B in the base plate of the upper projector. (image 3-16)
Image 3-12
Stacking two projectors
Image 3-13
Closing the rigging sockets
R5976654 SLM R12+ 09022004 19