Chapter 6
Performance Verification
Procedure
6-1 INTRODUCTION The following are the specific tests that should be used to verify the per
-
formance of the Power Amplifier Test System (PATS)
q
Source Output Level Accuracy Test
q
Return Loss Measurement Confidence Test
q
System Dynamic Range Test
q
Receiver Magnitude Display Linearity Test
6-2 CONVENTIONS In the tests in this chapter, instructions will direct use front panel hard
keys and softkeys. The hard keys and softkeys will appear in a different
typeface. For example:
Step 1. Press the Utility key and select:
DIAGNOSTICS
TROUBLESHOOTING
MORE
VERIFY ALC CALIBRATON
The Utility key is a front panel hard key and DIAGNOSTICS, TROUBLE
-
SHOOTING, MORE, and VERIFY ALS CALIBRATION are all softkeys.
6-3 TEST
EQUIPMENT
The following equipment is required to performthe verification proce
-
dures.
q
ANRITSU Model ML243XA Power Meter
q
ANRITSU Model MA247XA Power Sensor
q
ANRITSU Model 3653 or 3753LF N connector Calibration Kit
q
ANRITSU Model SC5237 6 dB Offset Termination
q
ANRITSU Model SC5270 20 dB Offset Termination
q
ANRITSU Model 11N50B Power Divider
q
ANRITSU Model 3670NN50-2 Cable
q
ANRITSU Model 34NN50A Adapter
q
ANRITSU 2100-2 GPIB cable
ME7840A OMM 6-1