B&B Electronics CR-25E Stereo System User Manual


 
Installation & Operations Manual
CR-25E Cable Beam Barrier Installation, Adjustment & Maintenance 8 of 31
© 2007 B&B ARMR WWW.BB-ARMR.COM (800) 367-0387
Connecting Rod Ends (Items11 & 13):
1. Grease with Texaco Marfak 2 or equal.
2. Wipe off excess.
Limit Switch Drive Chain (Item 8):
1. Spray chain with any good aerosol chain lube.
2. Wipe off excess.
1.6 Lubrication Replacement Instructions
Lubricate mechanism every 12 months with a manufacturer approved lubricant.
First gear drive box ( High speed housing):
1. Standing in front of the operator (roadway side) remove the door.
2. Locate drain plug on the bottom horizontal surface of the gear change box directly
under the motor. (Motor is horizontally mounted).
3. Position catch pan under drain plug.
4. Remove the oil fill plug on the top of gear box facing door.
5. Remove the drain plug until the oil is completely drained, then replace plug.
6. Remove the oil level plug.
7. Refill gear change box until oil flows from the oil level hole. Replug the oil fill
hole and the oil level hole.
Final drive gear box (Low speed housing):
1. Remove back door. Oil fill plug is located on the left-hand vertical surface, top.
Remove oil fill plug.
2. Standing in front of the operator (roadway side), remove the door.
3. Locate drain plug on the vertical surface of the final output gear box.
4. Position catch pan under drain plug.
5. Remove the drain plug until the oil is completely drained, then replace plug.
6. Remove the oil level plug.
7. Refill final output box until oil flows from the oil level hole. Replug the oil fill
hole and the oil level hole.