Step 4
Step 5
Step 6
Step 7
35
Installation Procedures
Figure 3-25b: Azimuth Jack Attachment
Tighten the hardware using the A-325 tensioning procedure.
Lubricate the jackscrews according to the maintenance instructions.
Pull the protective boot over the jackscrew, and clamp at the end as shown in Figure 3-26.
Note: Position condensation drain holes downward.
Figure 3-26: Protective Boot Attachment
Place pivot blocks (P/N 205876) on both sides of the jackscrew ends, bolting with lubri-
cated 1/2 inch hex bolt, flatwasher and hex nut as shown in Figure 3-25b.