Omnia 6 Use and Installation Guide – Version 1.00a
32
32
New
Used to create a new Schedule. Highlight and click on New to open the Modify Schedule window and
create a new Daypart Schedule.
Modify and Remove
Used to modify or remove an existing schedule. Highlight and click on the Schedule List, then highlight
and click on the Daypart Schedule you wish to modify. Highlight and click on Modify or Remove. Modify
will open up the Modify Schedule window and allow you to modify the settings of the selected daypart.
Remove will bring up a confirmation dialog asking if you want to delete the selected daypart. Answering
Yes to the prompt permanently deletes that Schedule from the system memory.
Load from Card
Retrieves Schedule/daypart data stored on the Omnia PC Card. This operation will restore any dayparts that
were previously saved to the card with the Save to Card operation, described next.
Save to Card
Stores the Schedule and daypart information on the Omnia PC Card. You might do this for safety or even
for sharing the data with other Omnia-6 processors. It saves all of the currently defined dayparts and the
daypart state to the Omnia PC card. These settings can be loaded later by selecting Load from Card.
Current State
Turns the Schedule function on and off. When Disabled, the Scheduler runs but does not load presets.
When Enabled the Scheduler automatically loads presets following the daypart schedule that is set up in the
current Schedule.