25
INSTALLER SECTION
Getting Started
Includes an installation overview, including tools needed and wiring instructions.
Component Guides
Reviews front and back panel features of the CAM6.6 controller and the UNO-S1 and UNO-S2
keypads.
Keypad Installation
Explains UNO-S1 and UNO-S2 keypad installation and wiring.
Making Connections
Details front and back panel connections of the controller and the keypad.
System Programming Overview
Outlines the programming planning process, and includes information forms to complete prior to
programming.
Installation Menu
Explains the programming menus that set up controller, keypad, source and zone operations.
Setup Menu Flow Char
ts
Presents the programming menus in a graphical flow chart format.
IR Device Codes
A list of controller’s IR device code library for source Device Code entries.
Key Function Codes
A list of IR codes for each command type contained in the built-in library.
Sour
ce Names
A list of Source Names available for assignment.
Sample Configurations
Diagrams of various configurations using CAM6.6s and other components.