69
Making Measurements
Test Timing
Test Timing
Description There are two aspects to test timing:
• Error results may be displayed as short term or cumulative over the
measurement period.If short term error measurements are required,
the short term period may be selected.
• The period of the test may be defined or controlled manually.
HOW TO: 1 Choose on the display.
2 Choose the SHORT TERM PERIOD to the timing required for short
term results.
3 Choose the type of TEST TIMING required:
For manual control with choose .
For a single timed measurement period started with ,
choose and choose the Test duration.
For a timed period starting at a specified time, choose , choose
the Test duration and the test START date and time.
TIMING CONTROL
RESULTS
RUN/STOP
MANUAL
RUN/STOP
SINGLE
TIMED