Sat Operation
Checking the LNB supply voltage of a satellite receiver
Connect the satellite receiver (IF input) with the MSK 33 (RF input socket). Switch
the supply voltage of the MSK 33 OFF and the voltage of the receiver ON. You
can now read the output voltage on the screen.
Calling up the DiSEqC/V SEC menu
In this menu, all the DiSEqC/V SEC control possibilities can be set ( refer to section
‚DiSEqC/V-SEC menu‘).
DiSEqC
VSEC
In case the MSK 33 is equipped with the option External DC, the LNB voltage must
be disconnected to charge the internal accumulator via this socket. Otherwise, the
internal accumulator will not be charged during LNB operation.
29