Continental Home MATE2 Speaker System User Manual


 
79
ADV/MATE/AGS-----------------------
choose category
QUIET VOLT
SETUP TIME START PG2
ADV/MATE/AGS/PG2----------------
choose category
LOAD MUST
PG1 START RUN PG3
ADV/MATE/AGS/LS------------------
load start 0 kw
DOWN AGS INC DEC
ADV/MATE/AGS/LS------------------
load start 1 min
delay
DOWN UP INC DEC
Go to the ADV/MATE/AGS screen and press the
<P2> so key.
At the ADV/MATE/AGS/PG2 screen, press the
<LOAD START> so key.
In the load start kw screen, an AGS start
command will be issued when the total AC load
of all the FXs connected to the MATE exceeds
this setting for the load start delay (next screen)
time. A zero value disables any load start function.
<INC> and <DEC> adjusts this setting between
1 – 50kW. Aer the value has been set, press the
<DOWN> so key to get to the load start delay
screen.
is setting is the delay time that the total system
AC load must remain above the load start kw
setting (see previous screen), before the generator
is started. It is adjustable from 1 to 240 minutes
using the <INC> and <DEC> so keys. Aer
making any adjustments to the delay time, press
the <DOWN> so key to go to the load stop kw
screen.
Load Start KW
Load Start Delay
To open the Load Start screen: