APC 208 Stereo System User Manual


 
Installation Procedures: Exchange Side Panels
12 InfraStruXure System - Installation and Start-Up
3. Remove the side panels from the sides of the PDU and XR Battery Enclosure that will not be
adjacent to the UPS.
4. Remove the rear hole covers from the panels that you removed in step 3.
Connect Battery Enclosure communication cables
1. Route the communication cable through the hole between the UPS and the XR Battery Enclosure.
Route the cable from the side of the UPS to which it is attached, around the back of the UPS, and
through the hole on the other side of the UPS to the front of the XR Battery Enclosure.
2. Connect the cable to Port 1 on the first adjacent XR
Battery Enclosure’s XR Communication Card.
3. Connect Port 2 on the first XR Battery Enclosure to
Port 1 on the next XR Battery Enclosure. Route the
cable the same way as described in step 5. Continue
until all XR Communication Cards are connected.
4. Locate the XR Communication Card terminator and
insert it into the open port of the last XR Battery
Enclosure in your configuration.
5. Install, on the UPS, the side panels that you removed from the PDU and the XR Battery Enclosure
in step 3 and re-attach the ground wires.
6. Install, on the PDU and the XR Battery Enclosure, the solid side panel that you removed from the
UPS in step 2 and re-attach the ground wires.
psx0020a
XR Communications Card
Port 1
Port 2
XR Communications Card
Port 1
Port 2
XR Communications Card
Port 1
Port 2
Symmetra PX UPS
XR Battery Enclosure 1
XR Battery Enclosure 2
Te rminato r
C
o
m
m
.
C
a
b
l
e
C
o
m
m
.
C
a
b
l
e
psx0145a
Te rm i n a t o r