RS-A9/EW
107
5678
56
7
8
C
D
F
A
B
E
Remarks
Offset voltage/Master clock must be adjusted in the product condition.
Input signal must be CD
-
signal.
The adjustment for offset voltage/master clock must be done within 2 or 3 minutes from the start of product
operation.
Master clock must be adjusted using high-frequency probe.
The measuring points for adjusting offset voltage must be as follows:
Sensing pin land : AL2 or its equivalent land and GND
Sensing pin land : AR2 or its equivalent land and GND
Sensing pin land : BL2 or its equivalent land and GND
Sensing pin land : BR2 or its equivalent land and GND
The measuring points for adjusting master clock must be as follows:
TP3001 or its equivalent land and TP3002 or its equivalent GND
1
2
3
4
5
6
23 tracks of test disc(YEDS-7)