GTO 2502 Home Theater System User Manual


 
18
At this stage of the installation, the openers should be installed on the
gate leaves and the open and closed position stops should be in place.
Post Bracket Assembly
Gate Bracket
MASTER Gate Opener
Closed Position
Positive Stop Plates
SLAVE Gate Opener
OPTIONAL Closed Position
Ground Stop Post
Step 3
Attach a vertical closed position stop plate to the SLAVE
gate.
Using appropriate hardware for your type of gate attach the
vertical
closed position stop plate to the SLAVE gate frame
at the point where it will come in contact with the ground
stop post.. Do not tighten it completely at this time. You must slide the closed position stop plate toward the ground stop until
they touch (Illustration C). Once you have moved the stop plate to the correct position, tighten its hardware completely.
NOTE: For a push-to-open installation (gate opens
out from the property) attach the closed position stop plate to the outside
of the gate.
Step 2
Install a low profile ground stop (not provided) beneath the
SLAVE gate stop plate.
The ground stop needs to be positioned near the end of the
gate as shown in Illustration A
and may be made of metal
or concrete and should be firmly secured in the ground (we
recommend setting it in concrete).
Closed Position Stop Plate mounted
on the gate leaf that CLOSES FIRST
Closed Position Stop Plate
Low Profile Ground Stop
in Near the Center of Driveway
FRONT VIEW
SIDE VIEW
Mount Vertically