12
4
STEP
• Attach the bearing tubes (AF2) to the over-
head lat arm (AC2) with four bolts (M6x15).
• Lift the overhead lat arm (AC2) and set
atop the upright frame (AG1) and the brackets
in the weight stack tower (AB1). Slide two
bolts (M10x98) with two flat washers
(10.2x22x2) up through each bracket on
weight stack tower and secure with two flat
washers (10.2x22x2) and two nylon nuts
(M10). Secure to top of upright frame by
sliding two bolts (M10x95) with two flat
washers (10.2x22x2) down through holes in
overhead lat arm. Secure with two flat washers
(10.2x22x2) and two nylon nuts (M10).
Tighten all hardware.
GREEN BAG
AB1
AB1
AC2
AC2
AF2
AF2
AG1
AG1