TC electronic SDN BHD P2 Stereo Amplifier User Manual


 
34
APPENDIX TROUBLESHOOTING
Loading Preset Banks
The P2 is loaded with the 8 presets from the
Default F1 bank (see page 37). These are the
presets accessible from the Front Panel .
However, it is possible to load other banks into
the front panel. To do this:
Press and hold LOCK when powering up.
All key LEDs will flash.
Press the key equivalent to the bank you
wish to load to the front panel.
Now the LEDs in the LOCK and BYPASS
keys will flash.
Press LOCK (green LED) to proceed/confirm
loading the selected bank or press BYPASS
(red LED) to decline/exit the bank load mode.
Notes
Reboot the TC Icon PC Editor between
connecting different P2 units.
Port Conflict
Another active application may conflict with
the serial ports you have selected on the:
Setup - Devices - Ports page.
If this is the case the following screen will
appear.
There are two options to resolve this
problem:
1 Connect the P2 to another physical COM
port and select this COMport an the COM
port page.
2 Close the conflicting application.