Sennheiser EK 300 IEM G3 Satellite Radio User Manual


 
Putting the devices into operation
11
Rack mounting two
transmitters
To mount two transmitters into a rack using the GA 3 rack adapter:
̈ Place the two transmitters side by side upside-down onto a flat surface:
̈ Secure the jointing plate to the transmitters using six recessed head screws (M 3x6).
̈ Secure the rack mount “ears” to the transmitters as described on page 9.
To mount the antennas:
̈ Use remote antennas, if necessary in conjunction with the AC 3 antenna combiner.
For more information, visit the ew G3 product pages at www.sennheiser.com.
To mount the transmitters into the rack:
̈ Slide the transmitters into the 19” rack.
̈ Secure the rack mount “ears” to the 19” rack.
Connecting the mains unit
Only use the supplied mains unit. It is designed for the transmitter and ensures safe
operation.
̈ Insert the yellow connector of the NT 2-3 mains unit into the yellow socket ¾ of the
transmitter.
̈ Pass the cable of the mains unit through the cable grip º.
̈ Slide the supplied country adapter ƿ onto the mains unit ƾ.
̈ Plug the mains unit ƾ into a wall socket.
The STANDBY button is backlit in red.
ƿ
¾
º
ƾ
The AC 3 antenna combiner incorporates DC distribution to enable simultaneous
powering of up to four transmitters via its BNC sockets. These transmitters do not
require their individual power supply (see also page 12).