MartinLogan E2 Home Theater System User Manual


 
16 Assembly
18 Use a level to plumb the electrostatic panel left-to-
right.
19 Measure the space between towers (top and bottom).
The space should measure exactly 2 inches.
20 Tighten frame bolts as shown.
Figure 32
Figure 33
Figure 34