320A
Compellor
Page 10
4.1 Unpacking
Your Compellor was packed carefully at the factory in a container designed to protect the unit
during shipment. Nevertheless, Aphex recommends making a careful inspection of the ship-
ping carton and the contents for any signs of physical damage.
4.2 Damage & Claims
If damage is evident, do not discard the container or packing material. Contact your carrier
immediately to file a claim for damages. Customarily, the carrier requires you, the consignee,
to make all damage claims. It will be helpful to retain the shipping documents and the waybill
number.
4.3 Mains Voltage Selection And Fuse
Before applying power to the Compellor, it is a good idea to verify the correct mains voltage
setting. This is easily determined by looking through the transparent fuse cover on the rear
of the chassis.
AC Line power is supplied to the unit via an integral receptacle/fuse holder on the rear panel.
This receptacle meets the various international safety certification requirements, provides the
international mains power selection, and serves as a radio frequency line filter. The pro-
grammed voltage can be read near the left end of the fuse clip on the surface of the program-
ming card. If the incorrect voltage is seen, proceed to reprogram the voltage.
Reprogramming the mains voltage is easy if the following steps are followed. Remember to
check the fuse value and install the correct fuse as indicated.
4. Installation
1. Slide window open
2. Pry out “Fuse Pull”
3. Extract programming card
4. Arrange correct voltage to read in this position.
Fully re-insert the card by pressing firmly.
Programming Card
Side 1 Side 2
100
120 220
240
FUSE
PULL
FUSE DATA
100-120VAC
0.375 Amp
Slow Blow
220-240VAC
0.25 Amp
Slow Blow