Start-Up Procedure: Apply power to the system
InfraStruXure System - Installation and Start-Up 39
2. Close (turn ON) the PDU distribution
panel breakers.
Note: When the distribution panel circuit breakers are closed, the PDU power cables and
connected equipment are energized.
Configure the InfraStruXure Manager
Once all equipment is installed, the network cables are connected to the InfraStruXure Manager hub (or
switch), and start-up of the system is complete, configure the InfraStruXure Manager.
For instructions, see the InfraStruXure Manager Installation and Quick-Start manual included
with your InfraStruXure Manager.
Note: If you use PowerChute Network Shutdown (PCNS) software with your InfraStruXure
UPS, your UPS must have a connection to the “User LAN” (public network) for PCNS to
function correctly. If the Network Management Card installed in your UPS is connected to the
InfraStruXure Manager’s “APC LAN,” you must install a second Network Management Card
in your UPS and connect it to the “User LAN”
(public network) to use PCNS.