Project EVEREST DD66000
CHAPTER 4
Unpacking the Project EVEREST DD66000 System
All components of the Project EVEREST system have been very carefully
packed for maximum protection against damage.
As with any superior audio product, it is advisable to keep the original packing
materials in case it is necessary to transport the Project EVEREST system.
Because of the bulk and weight of this loudspeaker, at least two people are
required to unpack it in the following manner.
Stainless steel round feet are installed onto the bottom of the speaker cabinet.
In order to avoid damages to the floor, we strongly advise to unpack on a well
protected surface such as a thick carpet or cardboard. (Loudspeaker system is
wrapped with non-wovens for protection, but this is omitted in drawings
below.)
I. Cut the straps, which tie the carton, by scissors or a knife. (Please be
careful that the cut strap springs up and hit your face or hand.)
II. Slowly lift up the top cover and remove it. If there is not enough room
above the box to pull out the top cover, cut side and top of it by a knife
(drawing II-2) and pull it horizontally (drawing II-3).
I II II-2 II-3
III. Remove cardboard and packing materials. Please do not forget to
take out accessories from the upper endpads.
IV. Remove upper endpads.
V. Slide down the loudspeaker system from the bottom board together
with bottom cardboard.
III IV V