Henkel 97211 Stereo Amplifier User Manual


 
18
5 Measuring
The operating manual of the used equipment is required.
The sequence of the first installation of the complete system is described below.
Be sure to follow the sequence otherwise you get a lot of problems and error messages.
Every step can be made independent of each other.
These are the 4 steps of installation.
Step 1:
Adjusting of the dispense quantity, see Section 5.1
Step 2:
Adjusting of the Preamplifier 97211, see Section 5.2
This has to be done when the pressure sensor is changed.
Step 3:
Setup of the Controller, see Section 5.3
This is for setting the tolerance.
Step 4:
Making a reference, see Section 5.4
This has to be done when a new reference is necessary.
5.1 Adjusting of the Dispense Quantity
Check whether the connection units are correctly installed according to their operating
instructions.
Adjust your required dispense quantity according to Chapter 5 of the operating manual
of the used controller.