![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/e/18/e188b9dd-0c54-4f4f-a493-07c73690cfba/e188b9dd-0c54-4f4f-a493-07c73690cfba-bg9.png)
Excessive Weight Hazard
Use 2 or more people to move and
install air conditioner.
Failure to do so can result in back or
other injury.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Remove side curtains. Slide curtains out
to their fullest width. From the back side,
remove the Phillips-head screws (A)
holding the curtains to the cabinet.
Remove the slotted hex-head screws (B)
holding the top channel.
Remove the slotted hex-head screws (C)
on the sides of the cabinet.
Holding both sides of the cabinet, care-
fully lift the cabinet off the base. Watch
out for the sharp metal fins on the front
and rear coils.
Wrap the motor, electrical control box,
and the compressor terminal box in
plastic film to make sure no water or
other liquid gets inside. Water or other
liquids could damage the insulation and
cause serious mechanical problems.
Clean and hose out the base, coils, and
condensate pans. Clean at least once a
year, or more often if the condenser
coils and pans collect dirt, sand, leaves,
insects, or algae. Also, clean if you detect
an odor coming from the air conditioner.
Do not use the collected water for drinking
purposes. It is not sanitary.
Remove plastic film from motor and
electrical parts.
Replace unit in the cabinet. Reattach top
channel and side curtains. Tighten all
screws.
Reinstall unit in the window.
Replace the front panel.
Plug in the power cord.
NOTE: It is a good idea to wait 24 hours
before starting the unit again. This allows
time !or all areas to dry thoroughly. The
water from rainfall or from normal opera-
tion does not harm the components.
9