MECHANICAL INSTALLATION 110TB
Fig. 8: Wire rope detailing
suspension or seismic tether.
Fig. 9: Installed subwoofer top view,
only two chains attached.
Fig. 10: Completed subwoofer
installation.
Fig. 11: Installing the hanger bolt. Fig. 12: Installed hanger bolt. Fig. 13: Suspension points with
turnbuckles installed.
Fig. 14: Leveled subwoofer. Fig. 15: Eyebolts in place of
threaded rod.
Fig. 16: Leveling the subwoofer.