8
INSTALLATION
Procedure for Installation on Carpet (Horizontal Position)
1
2 3
4 5
• Confirm that the built-in
anti-vibration boards on both the left
and right sides are set to the
horizontal installation position “0”.
• Attach the left and right brackets (A)
using the hexagonal bolt (M4 x 5).
• Attach the left and right brackets (A)
to their respective brackets (B) using
the hexagonal bolts (M6 x 12) and
the hexagonal nuts (M6).
• Pull back the carpet and determine
where to attach the unit.
• Stick the supplied double-sided
tape to the bottom of the brackets
(B) and peel off the paper backing.
• Affix the unit to the floor by pressing
in place.
• Using a knife, cut “X”s in the carpet
directly above the brackets (B) bolts.
• Return the carpet to its original
position allowing the bolts to stick
through.
• Remove the hexagonal nuts and
take off the changer.
• Once more, use the hexagonal nuts
to attach the changer on top of the
carpet.
Hexagon bolts
(M6 x 12)
Built-in anti-vibration
board position
Hexagonal
bolts
(M4 x 5)