A SERVICE OF

logo

Removal and Replacement Procedures 2-23
Power Switch with Cable and LED Indicators
To remove the power switch and cable assembly:
1. Perform the preparation procedures. See Powering Down the Server earlier in this
chapter.
2. Open the front bezel (tower model only). See Front Bezel earlier in this chapter.
3. Remove the small access panel. See Small Access Panel earlier in this chapter.
4. Remove the single T-15 screw securing the power switch to the chassis .
5. Slide the power switch housing back , then lift it out of the chassis .
2
3
1
Figure 2-19. Removing the power switch with LED and cable