33
2. Equipment connection and network setting
2.5.6 Schedule Setting (Continued)
Item Description
Specifi c date No1 Confi gures the specifi c date (No.1) schedule.
Schedule
Click the [Enable] check box to enable specifi c date (No.1)
scheduling.
Month/Day Confi gures the Month and date.
Schedule List Displays the current specifi c date (No.1) schedule.
Specifi c date No.2 Confi gures the specifi c date (No.2) schedule.
Click the [Apply] button to save the settings.
Schedule
Click the [Enable] check box to enable specifi c date (No.2)
scheduling.
Month/Day Confi gures the Month and date.
Schedule List Displays the current specifi c date (No.2) schedule.
Specifi c date No.3 Confi gures the specifi c date (No.3) schedule.
Schedule
Click the [Enable] check box to enable specifi c date (No.3)
scheduling.
Month/Day Confi gures the Month and date.
Schedule List Displays the current specifi c date (No.3) schedule.
Specifi c date No.4 Confi gures the specifi c date (No.4) schedule.
Schedule
Click the [Enable] check box to enable specifi c date (No.4)
scheduling.
Month/Day Confi gures the Month and date.
Schedule List Displays the current specifi c date (No.4) schedule.
Specifi c date No.5 Confi gures the specifi c date (No.5) schedule.
Schedule
Click the [Enable] check box to enable specifi c date (No.5)
scheduling.
Month/Day Set the Month and date.
Schedule List Displays the current specifi c date (No.5) schedule.
2.5 Confi guring and controlling the projector via a web browser (Continued)