Atlas Sound GST-G Speaker User Manual


 
1/2
AtlasSound.com
TELEPHONE: (800) 876-3333
FAX (800) 765-3435
©2010 Atlas Sound L.P. All rights reserved. Atlas Sound is a trademark of Atlas Sound L.P. All other trademarks are the property of their respective owners. All specs are subject to change without notice. ATS002960 RevE 7/12
GSS-G & GST-G
Garden Speaker
1601 JACK MCKAY BLVD.
ENNIS, TEXAS 75119 U.S.A.
Key Features
• DownwardFiringSpeakerWillNotCollectDustorCondensation
• RuggedConstructionCanSupportUpTo250lbs
• EasyBayonetAttachmentofHeadUnitToBase,EnablesInstallation
ofBaseDuringExcavationandInstallationofHeadUnitAfter
LandscapingHasBeenCompleted
• SwitchSelectable70VInputorDirect8ΩInput(TransformerBypass)
• EasyConduitInstallationinTallandShortBaseWithDedicated
MountingPads
• SpeakerProtectedByTripleLayerGrille
• ShortBase(GSS-G)hasDrillPointsfor4"Square,2-GangEOBox,or
1-GangBoxMountingtoaDeckorSlab
Instructions
To Install GST-B Tall Base Unit:
1. Makesureyouhaveapathtoburywireconnectedtospeaker.
2. Digahole8"deepx30"diameter.
3. Runwiretohole.
4. Attachconduitorglandnuttoflatsonbase.
5. Bringinwireandleavesufficientcableforadequateserviceloop
(minimum18")toreachheadunit.
6. Fillbasewithcleandirtorsandtowithin2"-3"oftopforoptimum
bassperformance.
7. Coverwithprovidedtemporarylidandattachwithprovided
1"screwsifheadunitisnottobeattachedimmediately.
8. Backfilldirttobase.Topofbaseshouldbe2"–3"aboveground.
To Install GSS-G Short Base Unit:
If Using an EO Box:
1. Install1-Gang,2-Gang,or4"x4"boxflushtomountingsurface.
2. Cutoutscribedlineonbottomofbasefor1-or2-gangbox.
3. Drillappropriateholesinbase(outer4holesfor4"x4",inner4for
2-gang,or1setof2innerfor1-gang).
4. Installwiringinbox.
5. Setbaseonboxandattachwithscrews.
If Using Conduit:
1. Mountbasetosurfacewithappropriatescrewsthroughthebase
bottom.
2. Attachconduitandbringinwire.Provideforsurfaceloop
(minimum18").
3. Coverwithprovidedtemporarylidandattachwithprovided1"screws
ifheadunitisnottobeattachedimmediately.
GST-G
Tall Base
GSS-G
Short Base