288 U41117-J-Z125-7-76
History data Global Status
time slice for PDS-scheduler
Time in seconds for which a PDS remains assigned to a PV group. After this time
has elapsed an active job is terminated and the drive may be unloaded. Depending
on the load situation it is then assigned to another PVG.
The value must be greater than or equal to 600 seconds.
Assignment of the physical drives to the PVGs can be controlled by different sized
time slices. The larger the time slice of a PVG, the greater its share in the use of the
drives.
The layout of the subsequent list of PVs is the same as that described on page 219.
When you select only one cleaning PVG you are shown the following data:
Statistical data of the cleaning PVG:
PVG Name of the PVG
Type Type of the PVG
PVs Number of PVs
available/used cycles
Total avaialble/used cleaning cycles
TL Library in which the PVG is located
jobs (wait-work)
Pending/active cleaning runs
Then follows a list containing the data of the individual volumes.
i